• <dfn id="q9m8q"><strike id="q9m8q"><wbr id="q9m8q"></wbr></strike></dfn>
      <rt id="q9m8q"><table id="q9m8q"><option id="q9m8q"></option></table></rt>
      1. <blockquote id="q9m8q"></blockquote>

        国产美女高潮流白浆视频,国产成人亚洲综合图区,亚洲爆乳WWW无码专区,重口SM一区二区三区视频,在线精品国产中文字幕,精品人妻二区中文字幕,在线视频中文字幕二区,国产午夜精品福利视频
        Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

        2020-07-20 17:48:44

        Share
        • Share to WeChat Moments

        Round steel forging diathermy equipment

        • Description

        圖片012.png

        Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

        1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

        2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

        3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

        4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

        5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

        6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

        7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


        Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

        When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

        高頻10.jpg


        Recommended Products

        HOME About Us Product News Case Video Advantages Contact
        主站蜘蛛池模板: 国产成人无码AV片在线观看不卡| 国产欧美日韩亚洲一区二区三区| 国精品91人妻无码一区二区三区| 又大又紧又粉嫩18p少妇| 成人亚洲一区二区三区在线| 亚洲国产精品人人做人人爱| 军事| 强奷白丝美女在线观看| 日本高清视频色欧WWW| 中文字幕熟妇人妻在线视频| 国产精品无码成人午夜电影| 最新亚洲人成无码WWW| 四虎影视一区二区精品 | 亚洲电影天堂在线国语对白| 深夜精品免费在线观看| 成人自拍短视频午夜福利| 国产精品区一区第一页| 久久久这里只有精品10| 成人嫩草研究院久久久精品| 色综合久久久久综合体桃花网| 91久久天天躁狠狠躁夜夜| 国产精品午夜福利免费看| 人妻熟妇乱又伦精品无码专区| 日韩精品中文字幕国产一| 男女性高爱潮免费网站| 久久99精品网久久| 亚洲精品宾馆在线精品酒店| 亚洲 自拍 另类小说综合图区| 国产精品视频一区二区三区无码| 国产日韩综合av在线| 政和县| 国产精品久久久久鬼色| xbox免费观看高清视频的软件| 无码激情亚洲一区| 亚洲一区二区三区自拍天堂| 久久精品人成免费| 亚洲av成人免费在线| 欧美性做爰片免费视频看| 国产成人一区二区不卡| 长腿校花无力呻吟娇喘| 国产一区二区三区AV在线无码观看|