• <dfn id="q9m8q"><strike id="q9m8q"><wbr id="q9m8q"></wbr></strike></dfn>
      <rt id="q9m8q"><table id="q9m8q"><option id="q9m8q"></option></table></rt>
      1. <blockquote id="q9m8q"></blockquote>

        国产美女高潮流白浆视频,国产成人亚洲综合图区,亚洲爆乳WWW无码专区,重口SM一区二区三区视频,在线精品国产中文字幕,精品人妻二区中文字幕,在线视频中文字幕二区,国产午夜精品福利视频
        Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

        2020-07-21 16:25:04

        Share
        • Share to WeChat Moments

        Infrared temperature measurement forging furnace

        • Description

        Operation steps of infrared temperature measurement forging heating furnace

        1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

        2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

        3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

        4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

        5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

        6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

        7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


        Maintenance of Forging Furnace with Infrared Temperature Measurement

        When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

        高頻10.jpg



        Recommended Products

        HOME About Us Product News Case Video Advantages Contact
        主站蜘蛛池模板: 成年女人免费毛片视频永久| 亚洲国产高清在线观看视频| 国产精品中文字幕第一页| 亚洲国产成人无码av在线影院| 激情综合网激情国产av| 妓院一钑片免看黄大片| 亚洲精品综合久中文字幕| 亚洲二区中文字幕在线| 亚洲三区在线观看无套内射| 内射极品少妇xxxxxhd| 亚洲人妻精品一区二区| 成人区人妻精品一区二蜜臀| 亚洲美免无码中文字幕在线| 久久久久久毛片免费播放| 特级毛片a片久久久久久| 亚洲成人av在线资源| 免费拍拍拍网站| 亚洲精品一区二区三区婷婷月| 久久精品国产99久久久古代| 亚洲国产aⅴ成人精品无吗| 欧洲熟妇熟女久久精品综合| 天堂中文8资源在线8| 精品人妻中文字幕在线| 国产精品自拍视频第一页| 一个色的导航| 97精品尹人久久大香线蕉| 亚洲精品国产电影| 农村妇女野外一区二区视频| 欧美成人精品手机在线| 久久精品娱乐亚洲领先| 免费人成视频网站在线观看18| 中文字幕久久久久人妻| 国产免费久久精品44| 精品无人码麻豆乱码1区2区| 亚洲精品一区三区三区在| 成人午夜在线观看刺激| 国产香蕉尹人综合在线观看| 少妇人妻激情乱人伦| 国产精品任我爽爆在线播放6080 | 国产专区一va亚洲v天堂| 麻豆国产尤物av尤物在线观看|